Offsite Construction Solutions

MODULAR ENGINEERING
FROM DESIGN TO DELIVERY.

Flowin applies offsite methodology to replace uncertainty with method. We design in BIM, produce under factory control, and assemble with technical predictability.

NEXLAR Platform

NEXLAR turns a house into an engineering product. Residential models from 40 to 120 m2 speed up decision-making and increase schedule and cost predictability.

On-site installation in less than 1 day

  • Reduced total construction timeline
  • Predictable cost from design stage
  • Lower material waste
  • 100% industrialized production
Flowin offsite construction solutions

Service Lines

Special Contract Execution

High-complexity offsite projects from BIM to final delivery: hospitals, schools, large residential, and industrial units.

Request feasibility analysis

NEXLAR Platform

Modular houses from 40 to 120 m2 with industrial engineering and highly efficient on-site assembly.

View NEXLAR models

Offsite Consulting

Implementation and process improvement for builders seeking scale through DATEC, FAD, BIM, and Lean Construction.

Talk to a technical consultant

Flowin Industrial Workflow

From BIM to Commissioning

01
BIM Technology

Executive design with full multidisciplinary coordination and clash detection before production.

02
Factory Production

Components and modules produced in a controlled environment with traceability and quality control.

03
Site Assembly

Fast installation with lower dependency on weather variation compared with conventional sites.

04
Final Delivery

Coupling, finishes, commissioning, and technical handover according to performance requirements.

Technical FAQ

Frequently asked questions about offsite solutions
How much does a NEXLAR modular house cost?

Cost varies by area, finishes, and location. NEXLAR is designed to compete with conventional construction while improving financial predictability.

Does Flowin deliver healthcare and education projects?

Yes. The technical portfolio includes 7 hospitals and 150 schools delivered with offsite methodology and proven high-complexity execution.

How fast can a project be delivered?

Offsite projects can reduce schedule by 30% to 50% versus conventional models, depending on scope and production strategy.

What are DATEC and FAD?

DATEC and FAD are technical documents linked to SINAT/PBQP-H for validation of construction systems.